CPUC Workshop - January 7, 2010 - Implementation of SB 412 to modify SGIP
1. OVERVIEW: On October 11, 2009, the Governor signed SB 412 (Stats. 2009, ch. 182) into law. SB 412 authorizes the CPUC, in consultation with the California Air Resources Board (ARB), to determine eligible technologies for the Self Generation Incentive Program (SGIP) based on the requirement that they “achieve reductions of greenhouse gas emissions pursuant to the California Global Warming Solutions Act of 2006.” On November 13, 2009, an ALJ Ruling was issued in R. 08-03-008, soliciting comments from parties on implementing the provisions of SB 412. This workshop will consider the questions posed in that ruling.
2. Introduction/Overview- CPUC Staff
Introductions
Housekeeping
Overview and workshop objectives
Materials: Presentation 1, SGIP Overview
[view discussion of item 2] 12 minutes 57 seconds
[Send item as an eclip]
3. SGIP Impacts- Itron
Materials: Presentation 2, SGIP Impacts
[view discussion of item 3] 1 hours 10 minutes 56 seconds
[Send item as an eclip]
4. Technology Review- Summit Blue
Materials: Presentation 3, Technology Review
[view discussion of item 4] 48 minutes 21 seconds
[Send item as an eclip]
5. Discussion
What should be the objectives and goals of SGIP
What should be the basis for determining incentives?
How should SGIP ensure performance?
Other program modification questions
Materials: Presentation 4, Discussion
Two clips; second clip will load automatically after first ends.
[view discussion of item 5] 1 hours 11 minutes 26 seconds
[Send item as an eclip]
6. Technology Proposals- multiple parties
California Clean DG Coalition(CCDC) and Capstone Turbines: Combined Heat and Power(CHP)
California Energy Storage Alliance(CESA): Energy Storage
TAS, Waste Heat Solutions and Guardian Industries: Waste Heat Organic Rankine Cycle engine
Zeropex:Pressure Reduction Turbine
Materials: Presentation 5a-5d
[view discussion of item 6] 2 hours 3 minutes 44 seconds
[Send item as an eclip]
7. Wrap-up
Summary
Next Steps-
Parties shall file and serve reply comments to the November ALJ Ruling no later than January 18, 2010
- Energy Division to provide a workshop report to the Administrative Law Judge, with a copy to the service list, with recommendations for further action based on the workshop and comments.
[view discussion of item 7] 2 minutes 4 seconds
[Send item as an eclip]